SGB Architectural and Interior Design Services

SGB Architectural and Interior Design Services Architectural, Interior Design and 3D Visualization Services

15/10/2025
22/01/2025

ANU-ANO BA ANG MGA REQUIREMENTS PARA SA BUILDING PERMIT?

Ang mga requirements para sa pagkuha ng Building Permit sa Pilipinas ay karaniwang nakadepende sa lokal na pamahalaan (LGU) kung saan ipinatatayo ang gusali. Subalit, narito ang mga pangkalahatang dokumento na kadalasang hinihingi:

Pangunahing Requirements:

Punan ang Application Form:
Maaaring makuha mula sa opisina ng Building Official o sa website ng LGU.
Certified True Copy ng Titulo ng Lupa (Land Title)
Magdala rin ng photocopy. Kung hindi ikaw ang may-ari ng lupa, magbigay ng Deed of Absolute Sale o Contract of Lease.

Tax Declaration
Kopya ng huling binayarang amilyar o Real Property Tax (RPT) Clearance.

Barangay Clearance
Nagpapatunay na may pahintulot mula sa barangay na ipatayo ang gusali.

Zoning Clearance:
Mula sa Zoning Office upang masigurong sumusunod ang proyekto sa zoning regulations.

Construction Plans
Five (5) sets ng plano na nilagdaan ng licensed architect o engineer. Dapat kasama ang:
Architectural Plan
Structural Plan
Electrical Plan
Plumbing Plan
Sanitary Plan
Mechanical Plan (kung may elevator o air conditioning systems).

Bill of Materials at Cost Estimates
Nilagdaan ng isang licensed engineer o architect.

Specifications
Detalye ng materyales at proseso ng konstruksyon.

Karagdagang Requirements:

Structural Analysis and Design
Para sa mga malalaking gusali, kailangang aprubado ng civil/structural engineer.

Geodetic Engineer’s Certification
Kung sakop ng proyekto ang boundary ng lupa o road right-of-way.

Fire Safety Requirements
Clearance mula sa Bureau of Fire Protection (BFP).

DOLE Clearance
Para sa mga malalaking proyekto, kailangang may Construction Safety and Health Program (CSHP).

Environmental Compliance Certificate (ECC)
Para sa mga proyekto na may potensyal na epekto sa kalikasan (halimbawa, malalaking commercial establishments).

Hakbang sa Proseso:
Magpasa ng Lahat ng Requirements sa Office of the Building Official (OBO).

Assessment ng Bayarin.
Magbabayad ng kaukulang fees depende sa laki at uri ng proyekto.

Pagproseso at Pag-apruba.
Ang Building Permit ay ilalabas kapag kompleto at aprubado na ang lahat ng dokumento.

Tandaan:
Siguraduhing ang lahat ng dokumento ay may pirma ng mga lisensyadong propesyonal.
Huwag magpatayo ng gusali nang walang permit upang maiwasan ang multa o demolisyon.
Para sa eksaktong detalye, makipag-ugnayan sa inyong City Hall o Municipal Office.

Proud to be part of this Firm πŸ–₯πŸ”‘πŸ–‹πŸ“
28/06/2024

Proud to be part of this Firm πŸ–₯πŸ”‘πŸ–‹πŸ“






DLR Group has relocated to a new office on Level 16 of the South Tower in Dubai Science Park Towers, UAE. The firm's new location in the centre of the vibran...

Project D is rising!Watch this space πŸ™πŸ™‚
17/03/2024

Project D is rising!
Watch this space πŸ™πŸ™‚

30/01/2024

Architect's 24-advice to 2024 house dreamers.

Before you manifest your House in 2024! You need to know these.

1.If you want convenience, buy a house and lot. You can move-in right after the turnover.Less hassle than building from ground zero.

2.If you have a parcel of land/lot, initially you would want to get an Architect to design your home. The technical plans (Architectural to engineering design) will be handed over to you. (Blueprints, specifications and bill of materials etc.)

3.The probable cost of the house construction will be given to you by your Architect. (30k to 45k per sqm is the most realistic cost)

4.The house can be built by reputable contractors through bidding (3 contractors are recommended then select 1)

5.After choosing the builder, you need to comply with the PERMITS such as building permit, barangay permits, fire safety evaluation certificate etc. (Refer to your local government for requirements)

6.Compliance with these, we can now start your house construction. Bring your deep pockets na.

7.Always keep in mind to hire a third party project manager if you're not a technical person in relation to construction. Your architect and engineer can always help you.

8.Remind yourself,structural work is expensive, architectural finishing is luxury. πŸ˜„

9.Keep your budget in check, progress billing of your contractor must be aligned to the actual accomplishment.

10.As the owner,you also have the responsibility to pay what's completed progress.

11.If you have changes to the actual work that's not specified on the plans, the contractor has the liberty to ask for additional cost. This is called "change order/variance".

12.Along the way you will be having delays, it may be the cause of your decision making or the contractor's delay due to various instances. Just in case this happens, add a clause to your contract for "liquidated damages". This corresponds to the cost of delay each day.

13.When choosing materials, seek for the quality made. It's your lifetime investment,not just a mere cheap one. If money is not a problem, "top of the line specs", i suggest πŸ˜„ Don't take your chances to substandard-china made faux.

14.Aesthetic is ok, function is better.

15.When dealing with contractors and engineers you need to acquire the harmony of collaboration. Para walang sa sakit sa ulo, build trust and rapport.

16.Peace of mind is the product of hiring professionals.

17.Professional's duties of building your house.
Architect - Predesign, design and construction
Project manager - Design to construction
Contractor - Construction to post construction
Property manager - Post construction

18.Your house must have a warranty,it must be agreed upon if how long, 3 months,6 months or 1 year.

19.Workmaship and material defects are okay for warranty. But if you caused the damage to the components, it may fall under additional charges.

20.Your house is done and you want to design/decorate your interiors,ask for the help of an Interior Designer, they are the expert on this field!

21.Make your house smart, purchase energy efficient appliances and control everything through wireless fidelity. Don't forget sustainable energy from solar panels.

22.Maintain your house brand new, schedule yearly house maintenance cleaning,monthly utility check and upscaling to quality material finishes.

23.Always remember this, a house is a liability if it doesnt give you revenue.

24.Last but not the least,small or huge, make your house a HOME of memories.

-Raw House Architect,2023

Address

Dubai
114574

Alerts

Be the first to know and let us send you an email when SGB Architectural and Interior Design Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to SGB Architectural and Interior Design Services:

Shortcuts

Share