AJW Maintenance

AJW Maintenance If you are looking for a job to be completed from a small task all the way up to a big project then

Almost complete wall. Few little things to finish but this was the finished design on the wall , hopefully I’ll grab a C...
08/05/2026

Almost complete wall. Few little things to finish but this was the finished design on the wall , hopefully I’ll grab a COMPLETE picture when it’s all all set up !

08/05/2026

Media wall along a 4.5m wide wall . 60inch fire .
All boarded with MDF , sprayed the base coat and 2 additional coats in hard wearing white paint , then a colour change to grey and finished off by the customer . All mdf edges were rounded off for a nice smooth finish .

25/04/2026

Another local media wall started !

01/04/2026

Living room , 2 sets of stairs and landings, and a master bedroom carpet fitted .

01/04/2026

Revisit to this property for an upgrade to the storage area , along with a little seating to remove/put on shoes 👞. Also a coat hook area.

One unit houses the boiler , false wall in the middle to hide the power unit, and some units at the bottom in various sizes for extra storage all sat on a frame to allow the new skirting to flow around the room like the kitchen skirting .
Magnetic hatch to access the power unit ,once all painted and coat hooks up I’ll have an updated picture to upload !

01/04/2026

Revisit to this wall panelling to create a header to finish it off . This will be painted by the customer . Updated pictures will be uploaded ASAP

New 1200x600 shower screen fitted
06/03/2026

New 1200x600 shower screen fitted

When this sink leak unchecked for years has soaked into the Lino (2 layers) and int the concrete  caused so many issues ...
22/01/2026

When this sink leak unchecked for years has soaked into the Lino (2 layers) and int the concrete caused so many issues in this property, soaking up into skirting and plasterboard , all removed and cut out and replaced .
Full tiled flooring installed once the floor had dried out , been sealed and self levelled ! All door frames and architrave cut 4mm off the tile finished level to stop any future leaks soaking up into these walls , silicone finish around the edge .

Just a before and after 🙌🏻
20/11/2025

Just a before and after 🙌🏻

15/10/2025

Original floor and skirting water damaged from a leak .
Leak repaired , skirting and flooring removed , floor primed , self levelled to level this rough concrete floor and bring up to conservatory floor level .
12mm flooring laid with underlay already applied to each plank .
Skirting replaced and ready for paint .
Hall way units back in place ready for the new layout in the future !

Address

Milton Keynes

Website

Alerts

Be the first to know and let us send you an email when AJW Maintenance posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share