Under The Iron Duck

Under The Iron Duck Under The Iron Duck Repairs, Refurbishes and Redesigns furniture. Commission Furniture is accepted by appointment.

Little Cutie is finished. (Well… I need to Install the K***s on the top drawer but it’s finished enough to show. Lol)I c...
06/29/2026

Little Cutie is finished.
(Well… I need to Install the K***s on the top drawer but it’s finished enough to show. Lol)
I chose a pottery barn finish on this. It’s timeless and simple.
🫣 I’ve decided to keep it. My LO is wanting a Boho room design. And this dresser is perfect for that.
Hard to believe the damage that it had before. You would never know now.
Challenge was accepted and I prevailed. 🥇

Day 100,000. Today was challenging. For some reason the sealer on this dresser decided to clump up. What should have tak...
06/28/2026

Day 100,000.
Today was challenging. For some reason the sealer on this dresser decided to clump up. What should have taken maybe 3 hours to complete has taken me all day. No worries I figured out a solution to the problem. But dang I was hoping to be finished today.

Day3-4. Primed, sandedThe painting magic begins today.
06/25/2026

Day3-4.
Primed, sanded
The painting magic begins today.

Day 2 Sanded, Cleaned, and Sealed with Shalac. The Shalac will seal the exposed wood and water damage. Also filled in or...
06/23/2026

Day 2
Sanded, Cleaned, and Sealed with Shalac. The Shalac will seal the exposed wood and water damage.
Also filled in original holes on the top drawer to create new hardware holes.

Day 1… damage is more than I prefer, but it is fixable. Bondo to the rescue. Drawers are all perfect. Most the work will...
06/22/2026

Day 1… damage is more than I prefer, but it is fixable. Bondo to the rescue.
Drawers are all perfect. Most the work will be to the frame. Challenge accepted.

Picked up this cutie today. New inventory. Let me know if your interested in a custom redesign.
06/22/2026

Picked up this cutie today.
New inventory.
Let me know if your interested in a custom redesign.

Day 1 Tackling the 6 chairs first.
06/15/2026

Day 1 Tackling the 6 chairs first.

Address

Bartlett, TN
38133

Website

Alerts

Be the first to know and let us send you an email when Under The Iron Duck posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share