“When can you start?”
It’s usually one of the first questions I’m asked. And I get it. Once you’ve decided to build, you want to get going.
But most people are surprised by how much happens before a builder ever sets foot on site. Surveys. Soil tests. Bushfire and engineering reports. Design, then planning, then documentation and permits. Some of it runs side by side. Some of it can’t start until another report comes back.
Swipe for the four stages. All up, allow 18 months to 2 years from first enquiry to moving in.
The full breakdown, including which consultants you might need and how long each one takes, is on the blog. Link in bio.