01/24/2026
Whole-house design project in Contrecoeur is being thoughtfully developed in phases, starting from the basement and moving upward.
Phase 1 is focused on transforming an unfinished basement into a functional and well-balanced space that includes a home office, gym, and bathroom. One of the main challenges was connecting the office and gym without making either space feel tight or overcrowded. This was resolved by introducing a window wall to visually separate the areas while maintaining light and openness. Another key intervention was the reconfiguration of the staircase to improve circulation and overall flow.
The design phase for Phase 1 is now complete, and ex*****on is officially underway. The design phase for Phase 1 is now complete, and ex*****on is officially underway. Here's a little insight into the project.