20/10/2025
Another day, another project over the line.
This outbuilding was a former stables with a large crack / ridge across the room part of a public house.
Pre smooth we used SASGO Ltd latex, then applied a one coat dpm, this had a final thick coat of latex.
Due to the tenting of the ridge running through the room the final
preparation was ARDEX UK rapid 45 repair mortar and feather finish to smooth out not level the floor.
The Polyflor Ltd Camara lvt was installed using F. Ball and Co. Ltd. F58 plus adhesive.
CONTRACT FLOORING ASSOCIATION