05/06/2026
When Wyborne Primary School needed their canteen hall brought back to life, they had just one window to make it happen: the half-term break.
With 200m² of tired, worn flooring, a tight deadline and a dining space that needed to be ready the moment the children walked back through the door, there was no room for anything other than a perfectly executed plan.
Our team moved in straight away, stripping everything back before prepping the subfloor and laying Walkway slip-resistant sheet vinyl throughout the entire space. Every joint was hot-welded for hygiene and water resistance, heavy-duty edgings were finished to last, and the whole surface was engineered to handle decades of daily school footfall without missing a beat.
By the time the school returned from half-term, the dining hall felt completely transformed, bright, fresh and ready for whatever a few hundred hungry children could throw at it.