28/06/2017
Bathroom Refurbishment – Bushey
I have just completed a full bathroom refurbishment which, once stripped back, posed some issues. The bonding on all of the walls had blown, a simple solution is to stick plasterboard directly onto the walls ensuring a smooth and level finish for tiling.
As you can see from the before and after pictures this was a very tired bathroom that has now been transformed into something modern and bright.