The Christmas shutdown window books up fast.
We are already taking calls from facilities managers who left it until October last year and found there was little room to move.
The floor, which has been getting worse all year, is not improving on its own. Patching it again is not really patching it, it is moving the problem forward twelve months, usually at more cost than doing it properly would have been in the first place.
If you have a December window and a floor that needs sorting, now is the time to investigate.
We have written up how shutdown flooring works in practice, including the survey, the spec, the cure times, and the phased approach for bigger sites. Head over to the Lasercroft website to find out more. https://lasercroft.com/2026/09/03/factory-shutdown-flooring-how-to-make-every-hour-count/
Call Rob on 01482 229119 if you want something in the diary.