18/09/2026
Not put much on for a while so thought I’d share a kitchen transformed last week in Newton.
A feature wall to strip, fill, sand, fill, sand and then clean and prime before even thinking about the paint.
Woodwork sanded, cleaned and primed and the remaining walls filled, sanded and cleaned ready for painting.
Once the prep was done, a couple of coats of durable white emulsion on the ceiling and two coats of durable emulsion in Park Cafe from the Valspar Tough range to the walls.
Finally a couple of coats of Dulux Trade Satinwood to the woodwork.
A really lovely transformation and a very happy customer.