14/05/2026
Another one down! This sub floor was horrendous, old floorboards, old concrete and height differences after previous renovations but after boarding with 9mm ply and two coats of pro flow finish, its was a lot better!
Then came the fitting of the lvt and job done, this stunning new kitchen is another step closer to completion!
Fitted on behalf of MJM Flooring LTD, on the job for with another stunning kitchen π