17/10/2026
More Herringbone lvt this week, j2 flooring this time. A lot of prep here due to underfloor heating matts. These have been deep fill screeded over using Mapei, flooring grade ply installed initially and primed. Then a finishing screed of Kelmore pro before flooring installed using fballs f48 plus ht adhesive