03/05/2026
Some Pictures Of New Chamber Opened And Plastered, With A Freestanding Stove Installation.
Firstly The Old Fireplace Was Removed And Then Chamber Was Opened Up And A New Granite Hearth Was Installed. All Plaster Work was Done Inside The Chamber And The Full Chimney Breast. Enamel Stove Was Then Installed To Finish The Job.
The Stove Was Connected With A Flue Adapter Kit. All The Flue Pipe Was Sealed And Checked. Stove Was Then Lit Up For A Demonstration To Show The New Customer.
All Work Carried Out By The House Of Fireplaces And Stoves, Park Street, Dundalk, Co. Louth. Contact Us On 087 6345536