๐๏ธ 10 Months Site Progress Update
After 10 months of construction, this project has made incredible progress from the initial groundwork to the advanced stages of development. What started as a simple foundation is now transforming into a beautifully structured modern home.
During the first months, our team focused on site preparation, excavation, and foundation works to ensure the structure would have a strong and stable base. Once the foundation was completed, we proceeded with the structural framework, including columns, beams, slabs, and reinforced concrete works that form the backbone of the entire house.
As the structure progressed, we moved into the masonry and wall construction, shaping the layout of each room and defining the spaces of the home. Roofing installation followed, allowing the building to be protected from weather conditions while interior works began.
Currently, the project has entered the finishing stage, where major elements such as plastering, electrical works, plumbing systems, ceiling installation, and tile works are being completed. Interior spaces are now taking shape as cabinets, fixtures, and design details are gradually installed.
Every stage reflects the dedication, craftsmanship, and teamwork of our construction team. From the structural phase to the finishing touches, each detail is carefully executed to ensure quality, durability, and modern design standards.
We are excited to see this project getting closer to completion and look forward to revealing the final result very soon. Stay tuned for more updates as we continue bringing this modern house vision to life! โจ๐ก