Ubl Design Group

Ubl Design Group Architecture | Interior Design | Urban Design Jeff is the president and creative leader of the firm.

Ubl Design Group is an innovative design practice built on the strength of our people and personal relaitionships with our clients. Recognized for excellence in planning, design and execution, we provide a wide range of services for an even wider range of markets, including Civic and Government, Entertainment, Education, Mixed Use, Workplace, Energy, Manufacturing and Residential. We continuously

strive to inspire our clients and our community with imaginative building solutions, utilizing the talents of our multi-disciplined staff that includes architects, interior designers, graphic designers, construction administrators and animation specialists. We believe that innovation exists within all projects, and our balanced emphasis on design and execution allows us to maximize those opportunities for our clients. His experience includes the Bismarck Airport Terminal, Bismarck Public Works Facility, Bismarck Public Schools Career Academy and Lewis and Clark Interpretive Center.

Congrats Greg! What an accomplishment.
05/07/2026

Congrats Greg! What an accomplishment.

Please join us in congratulating Airport Director Greg Haug on an incredible 35 years of service! Since joining the airport in 1990, Greg has guided BIS through tremendous growth and change. He was instrumental in the construction of the airport terminal, led the airport through the many changes that followed 9/11 and played a major role in positioning BIS for the future. Under his leadership, annual passenger boardings have grown from 137,367 to 309,533 travelers.

Thank you, Greg, for 35 years of steady leadership, vision and dedication to the travelers and community we proudly serve!

Well done Matt!
03/09/2026

Well done Matt!

Great project for the airport first responders.
02/24/2026

Great project for the airport first responders.

Big things coming to BIS
02/19/2026

Big things coming to BIS

02/11/2026

North Dakota's eight commercial service airports in 2025 collectively set a record for boardings for a second consecutive year, despite the prolonged federal government shutdown last fall that impacted air

12/21/2025
02/15/2025

Ubl Design Group Returns as Presenting Sponsor for the 2025 Lyons-Heart Gravel Classic

We are thrilled to announce that UBL Design Group is returning as the presenting sponsor for the 2025 edition of North Dakota’s premier gravel race. Building on last year’s incredible success, UBL Design Group’s continued partnership underscores their commitment to supporting the vibrant cycling community and fostering the spirit of adventure.

The 2025 Lyons-Heart Gravel Classic will take place on July 12th, offering participants three iconic race options: a 35-mile challenge, a 65-mile endurance ride, and a grueling 100-mile test of grit and determination. Riders can once again compete for a substantial $7,000 cash prize purse, making this event a standout in the gravel racing calendar.

UBL Design Group's support has been instrumental in elevating the Lyons-Heart Gravel Classic to a marquee event, and we’re looking forward to building on that momentum for 2025. Their continued sponsorship not only reflects their dedication to the local community but also highlights their belief in the transformative power of cycling and outdoor adventure.

The Finish Line Party will return to downtown Mandan, offering participants and spectators an unforgettable celebration. With live music, local vendors, and a vibrant atmosphere, it’s the perfect way to cap off a day of intense racing and community connection.

Registration for the 2025 Lyons-Heart Gravel Classic is now open. We welcome riders of all levels and encourage you to secure your spot early and gear up for an adventure-packed day on North Dakota’s breathtaking gravel roads.

12/20/2024
Happy to continue our long relationship with BIS and their great team.
10/21/2024

Happy to continue our long relationship with BIS and their great team.

Amid the angst, upheaval and tragedy that COVID-19 unleashed, there were also isolated slivers of opportunity. One of those rare instances occurred at Bismarck Airport(BIS) in North Dakota.

Airport Director Greg Haug knew his staff needed a bigger building for its snow removal equipment. The new 40,000-square-foot building has enough room to store all of the airport’s snow removal equipment under one roof, and also includes a maintenance station and separate vehicle wash area.

Read the full article at ➡ https://airportimprovement.com/article/bismarck-airport-adds-new-snow-removal-equipment-facility/

06/25/2024

Gonna be a great day!!!

Address

210 S 12th Street
Bismarck, ND
58504

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+17017514555

Alerts

Be the first to know and let us send you an email when Ubl Design Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Ubl Design Group:

Share