09/17/2026
This one step gets skipped more than any other — and it can ruin a brand-new floor.
In South Florida, moisture hides inside concrete subfloors. Lay flooring over a slab that's too damp and you risk mold underfoot, adhesive failure, and a warranty that won't cover a thing.
Here's what we do on every job: we moisture-test the subfloor BEFORE a single plank goes down. If the readings are high, we handle it — moisture barriers, leveling, the right prep — so your floors last.
A pretty floor means nothing if the foundation isn't ready. Ask any installer you're considering: "Do you moisture-test the subfloor?" If they hesitate… that's your answer.
Thinking about new floors? DM us or tap the link in bio for a FREE in-home estimate. We'll check your subfloor and tell you exactly what it needs — no guesswork.