02/13/2026
We were called with a major problem. The doors installed had a problem with the reveal on the bottom plate. Reveal went from almost an inch to nothing on one side. After straightening the reveal with 12 foot Floating Screed, we did one solid pour across the room. Feather Finished all the edges and did a final skim coat with Ardex Feather Finish. Almost 900 lbs of mud later and 12 hours of floor prep, The Slab is ready to be Ground Down for The Epoxy Company coming in. Prep is part of our service. If we can be of any help with your Floor Demo, Installation, Service or any Flooring Questions, feel free to shoot us a message or call us at 239 878 0590. Customer Service has and will always be #1