05/22/2026
Challenging project with a perfect result ⚒️
We installed engineered wood flooring over a heated subfloor using a glue-joint floating installation method.
Once we removed the carpet we discovered uneven subfloors, humps, bumps sticking out around the perimeter. Before installing the floors we spent hours leveling everything to create a smooth proper foundation.
Renovations often come with surprises but proper prep is what makes the final result last!
Planning your own renovation? Contact MODO FLOORS for an in-home consultation ⚒️