06/29/2026
🦁 THE FLOOR PROCESS · PART 3
The pour. This is where it all comes together. 👇
Before a single drop, we set leveling pins across the entire room at different heights. Each pin marks exactly how high the self leveler needs to reach in that spot, so the whole floor finishes dead level instead of wavy.
Then we pour. Mixed right, worked fast, done right. And when it’s finished, your subfloor should look like this: smooth like glass. No waves, no high spots, no guesswork. We leave the pins peeking out just enough to know every inch hit the right depth.
That glass-smooth base is the difference between a floor that looks flawless for years and one that telegraphs every flaw underneath. Most people never see this step. It’s the whole reason the finished floor lands perfect.
Metro Detroit, this is how a floor gets done right, start to finish.
🏆 Part 1 was the prep, Part 2 the setup, and this is the pour.
📞 BRC Flooring: 313-725-1392 ·
🌐 brcflooring.com