If a 2027 renovation is even remotely on your radar, this is the part I want you to know now: your project probably needs to start sooner than you think.
Every fall, I hear some version of the same thing: “We’re thinking about renovating our kitchen next year.” And usually, “next year” means spring.
But a successful renovation doesn’t begin when demo starts. It begins months earlier with the right team, space planning, design decisions, permits, contractor scheduling, cabinetry, windows, and all the long-lead pieces that need to be in place before construction ever begins.
That’s exactly what my newest blog is about: Why your 2027 Seacoast NH renovation actually starts now.
I’m walking through the timeline I use with clients, why bringing your designer, builder, and architect together early matters, and how thoughtful planning can help avoid the kind of delays that leave you without a kitchen far longer than necessary.
If you’re in the New Hampshire Seacoast area and you’ve been thinking about a kitchen renovation, primary bathroom, or larger whole-home project, this is a good one to read before the holidays arrive.
Because “next year” feels far away...until you work backward from the day you want construction to begin.
Read the new blog at the link below, and if a 2027 renovation is on your wish list, now is the time to start the conversation.