06/08/2026
Event Center – Work in Progress
We’ve expanded the property by adding two new wings on both sides, creating additional functional space and improving the overall flow of the venue.
Large fixed glass windows and sliding glass doors are being incorporated to maximize natural light, create a brighter atmosphere, and enhance the connection between indoor and outdoor spaces.
An open bar concept is currently being designed, with the flexibility to be enclosed when not in use, providing both functionality and versatility for different event styles.
The tongue-and-groove ceiling treatment is underway, and we have finalized the stain selection to bring warmth, character, and a refined finish to the space.
Plumbing and electrical work are progressing simultaneously for the restrooms, bridal/changing room, bar area, kitchen, and service spaces, ensuring everything is seamlessly integrated as the project moves forward.