08/28/2026
This 2,000-square-foot project came with a challenge: a highly congested workspace that required careful planning, coordination, and attention to detail every step of the way.
Thanks to great collaboration between Mayo Clinic, the GC, and our foreman Lukasz, the Pro Maintenance crew delivered an outstanding finished product. The team installed ¼-inch urethane cement with a specialized media blend for added traction, followed by PIP’s 2000 UR topcoat.
The result? A floor that looks almost as smooth as a hangar floor while providing the durability and traction the space demands.
Projects like this showcase what great planning, skilled craftsmanship, and teamwork can accomplish.
Great job, Lukasz and crew!