Rod Mortensen, Architect

Rod Mortensen, Architect Interior Architecture &
Historic Preservation Contact me through my website About Us tab or send me a message on Facebook Messenger.

This remodel and garage addition has aged well.
06/25/2026

This remodel and garage addition has aged well.

They finally put in the garage I planned back in 1997! 👍🤣❤️
06/25/2026

They finally put in the garage I planned back in 1997! 👍🤣❤️

03/20/2026

Have you been following the news about the Rio Grande Depot?

The 116-year-old landmark has a lot happening around it right now. The University of Utah is set to take ownership of the building from the state while also moving forward with plans for a west-side campus on a parcel just west. Salt Lake City is actively rezoning the Rio Grande District and has its own redevelopment vision for the area. And the depot itself is still midway through a seismic retrofit following the 2020 earthquake.

What's less clear is how all of these pieces connect. There's no announced plan yet for what the depot itself will become, and some of the biggest decisions about transit, housing, and the building's long-term use are still being worked out by different players at different tables.

We'll be keeping a close eye on this one. The Rio Grande Depot is a designated local landmark and listed on the National Register of Historic Places. Its future matters, and we think the community deserves to be part of that conversation.

Read the full story on our Preservation News in Utah page.
https://www.preservationutah.org/preservation-news-in-utah

https://www.facebook.com/share/1AGnXZjKue/?mibextid=wwXIfr
01/10/2026

https://www.facebook.com/share/1AGnXZjKue/?mibextid=wwXIfr

After the 2019 fire, the biggest challenge at Notre-Dame was not rebuilding, but saving what was still standing. The stone walls and flying buttresses survived, but they were under extreme stress. Heat had weakened the limestone, metal elements had expanded, and tons of water used by firefighters soaked the structure. For months, engineers feared parts of the cathedral could collapse long after the flames were out.

One little-known fact: before any real restoration could begin, the entire site was considered toxic. The roof and spire were covered in lead, and when they burned, microscopic lead dust spread everywhere — inside and around the cathedral. Workers had to operate in protective suits, and Paris set up strict safety zones. This phase alone took more than a year.

Another key decision was political and symbolic: France chose to rebuild Notre-Dame exactly as it was, not redesign it. That meant recreating medieval techniques almost from scratch. Over 1,000 oak trees were selected to rebuild the roof frame, chosen for size, age, and grain, just like in the 13th century. Some trees were over 200 years old.

The stone vaults were repaired, not replaced. Many blocks were cracked but still usable, and experts preferred reinforcing them rather than starting over. This slower method preserved as much original material as possible.

A surprising result of the restoration is the cathedral’s brightness. Many visitors think the interior looks “new,” but it’s actually closer to its original color. Centuries of candle smoke, pollution, and dust had darkened the stone. Cleaning revealed pale limestone that hadn’t been visible for generations.

Finally, the project became a massive coordination effort. Architects, historians, engineers, carpenters, and stone masons worked together, often debating tiny details most people will never notice — like tool marks or mortar texture.

What this restoration proves is simple: Notre-Dame wasn’t rebuilt quickly. It was rebuilt carefully, with the goal that, one day, people will forget there was ever a fire at all.

Address

Lindon, UT

Alerts

Be the first to know and let us send you an email when Rod Mortensen, Architect posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share