10/09/2026
A basement floor, start to finish.
This slab had cracks running through it, around the support posts and along the walls. We filled every crack, poured self-leveler over the low spots, then ran the plank through the hallway and across the main room, right up to the carpet at the doorway.
Thinking about new floors? Message us to schedule your in-home consultation.