02/20/2026
BEFORE / AFTER pic’s of a little basement 1/2 bath Winn Build completed last December 25’. The homeowner wanted to update the space in a “japandi” motif as well as address practical concerns such as lighting and odor exhaust. If you are wondering where the toilet is at, a macerating toilet has been installed since our portion of the work has been completed. This was a little project but we had a lot of fun bringing the vision to life. If you or someone you know is in need of DESIGN / BUILD home remodeling services give us a call!
309-732-6267