07/02/2026
This is underneath the prior kitchen, there was a 6” dip within a 10 sq ft area where the kitchen connected to the bathroom. 8 2’x2’x1’ concrete pier pads with jack posts, and 56 bags of 80lb concrete later and we lifted the floor enough to make it feel flat to walk on. I couldn’t take it level without compromising the rest of the flooring system so we worked with what we had and the clients love it.