07/12/2025
We’ve been laying low this month—mostly tile. Precision, patience, and maybe a little grout in our energy drinks. It’s been a productive stretch(6000+ sq ft of tile) : long days, sore knees, and some seriously sharp results. The kind of work that speaks for itself (but we don’t mind showing it off either). Cameron Thompson Jarren Stewart