39 decisions you need to make BEFORE your bathroom remodel starts.
We tagged every single one in this bathroom. Vanity style, plumbing fixtures, countertop material, shower glass, flooring transition, lighting placement, mirror scale, hardware, paint color, ventilation, storage layout, and more.
Most homeowners walk into a remodel having chosen maybe 2 or 3 of these. Then the contractor is on site and waiting. The timeline stalls. The budget creeps because you’re making rushed decisions under pressure, or because the tile you fell in love with has a 12-week lead time nobody warned you about.
The rule we follow with every client before a single wall comes down: every decision made, every item ordered. It protects your budget. It protects your timeline. And it means the finished room looks exactly the way you planned, and not like a series of compromises made in a hurry.
Planning a bathroom remodel? Save this before you start.
👇 Save this, and DM us the word BATHROOM for our free pre-remodel selection checklist.
Photo by Sarah Baker Photos
interiordesign interiordesigner OKCinteriordesign designdirectionsokc beforeyouremodel