08/21/2026
Basic tile install over your typical commercial framing. 6 stalls done. They wanted to keep the epoxy cove that sloped with the pan. So that was fun just wrapped up at midnight last night. Bostik total prime ( over epoxy) , Mapei utraflex 2, schluter PVC trim at the Natick army base