08/22/2026
July 1 - 24, 2026 We kept working on the floors of the cottage. We had to use leveling cement again. We first used it two years ago on the basement’s bathroom floor. Now we had to put it in the entry to our master bedroom from the kitchen. This is where we had placed a heavy beam into the floor to add support for the loft and also where we had lowered the altar to floor level. The floor wasn’t quite level when we replaced the floor in those spots. The leveling cement is not a fun experience as it’s messy and sets up quickly!😬 After that dried for a few days we went back to extending the luxury vinyl planks from the kitchen into our bedroom and did 99% of the living/dining/kitchen LVP flooring. The entryway to the cottage will not get new flooring yet as we need to jack up the floor a bit in the area of the basement steps. Then we began the flooring in the master bathroom as we wanted to get the toilet, two vanities, and the stackable washer and dryer installed. Sam also worked on the plumbing under the space for the kitchen sink. The master bathroom was nearly completed in this period of time. Still need to install the toilet! 🤷🏻 But I’m now washing and drying clothes at the cottage. A big hurdle we’ve gotten over. I have to say I do miss doing our laundry at Mom’s every ten days or so. I mainly miss spending those three-plus hours with Mom. We got a lot of visiting done while I was there!🥰