10/09/2026
π₯ CHECK OUT THIS BASEMENT TRANSFORMATION!π₯
After removing the carpet, we found the concrete in rough shape. It took 31 bags of self-leveling compound to get the floor ready for installation!
β
Removed Carpet
β
Installed 1,000 sq. ft. of LVP
β
Installed Steps and landing
β
Subfloor leveled to meet installation tolerances
Proper subfloor preparation is critical to the performance and longevity of floating floors. Even though it gets covered up, we make sure it's done right!
Just another way Preferred Flooring is Exceeding Expectations! πͺ
π 402-443-2455